Fire stopping in Lambeth

Every pipe, cable and duct that passes through a fire wall or floor leaves a hole. We close them with tested seals and label each one.

  • Every seal labelled and photographed
  • BM TRADA / FIRAS-certificated contractors
  • Written price before any work
Get a price

We reply with a written price.

We use these details to reply to you. See our privacy notice.

The first photo on this page is a red pipe running past a square of board on a blockwork wall. Above it a wire tray crosses the same wall. The question on a job like that is simple: where the pipe and the tray go through, is anything holding the fire back? On that one the board patch had been started and the edges were still open.

Lambeth has almost every kind of building that gets this problem. Victorian houses in Brixton, Stockwell and Herne Hill cut up into three or four flats, where the floors between flats were never built as fire floors. Council blocks from the 1960s and 70s with service risers that have been re-cabled several times. New towers at Vauxhall with plastic waste pipes in every riser. Offices and hotels round Waterloo where tenants change and so does the cabling.

A red pipe running past a board patch on a blockwork wall, with a wire tray crossing above
A red pipe running past a board patch on a blockwork wall, with a wire tray crossing above

What gets sealed

A plastic soil pipe through a concrete floor takes an intumescent collar. A bundle of data cables through a block wall takes a coated batt and mastic, or a sleeve of sealant if the hole is small. A long open joint at the top of a wall, where blockwork stops short of the slab, takes a strip of mineral wool and a bead of fire-rated mastic. Each one is a separate product with its own test, and the size of the hole decides which one fits.

The services pages go into each kind: the compartmentation survey, fire stopping around pipes, fire stopping between floors, cavity barriers in converted houses, intumescent mastic and linear gaps and inspecting fire stopping somebody else did.

What you get at the end

The sealing is done by our BM TRADA / FIRAS-certificated contractors. Each seal gets a numbered label on the wall beside it and a photo once it is finished. You get a schedule that lists them: number, location, what passes through, what product went round it, the fire rating, the photo reference. When the fire risk assessor comes back, that schedule is what they ask for.

Work we have finished includes a health club plant room where foam round the main power cables was cut out and replaced, and 64 openings in a block of flats after a fire risk assessment rated the compartmentation as high risk.

A round duct coming through a coated batt seal, finished with sealant round its base
A round duct coming through a coated batt seal, finished with sealant round its base

Price

Jobs usually start at around £2,000 plus VAT. A compartmentation survey is priced once we have seen the plans and know how many floors and risers there are. Send a postcode and a couple of photos with a tape measure in shot and you will get a first figure back.

How it works

  1. 1Send the detailsThe postcode, the type of building and a photo or two of the gaps.
  2. 2Survey and written priceWe walk the building, record each breach and price the sealing.
  3. 3Sealed and recordedEach seal is fixed, labelled and photographed for your fire safety file.

Where we go

Our certificated contractors work right across Lambeth, from Waterloo and Vauxhall in the north down to Streatham and West Norwood.

Seen a hole round a pipe or cable?

Send the postcode and a photo with a tape measure in shot. We will tell you what it needs and what it is likely to cost.

Call 020 3772 6233Get a quote